2 room apartment new condition, sea view and pool | Apartment in Théoule-sur-Mer

5.0 (1 Review) |   1 Bedroom  1 Bathroom  4 Guests
Theoule-sur-Mer Apartment | 2 room apartment new condition, sea view and pool

1 Bedroom Apartment in Theoule-sur-Mer, Théoule-sur-Mer

2 rooms 32m2 new condition, sea view in Théoule-sur-Mer in secure residence with caretaker, digital code, very quiet at the entrance of the Esterel (50m from the start of hiking / mountain biking - Mountain bike rental with or without electric assistance 1.5 km), private parking space in the basement, large lift, electric heating. Panoramic view of the sea and the Alps (see main photo taken from the apartment's terrace).
Magnificent infinity pool 450m-2 (+ jacuzzi) open from early May to late September / early October, monitored in July and August. Paddling pool for the little ones. Solarium with free deckchairs and parasols available.
Apartment located on floor 3 of 4.
Living room with a double sofa bed, flat screen TV, DVD player, Voltaire armchair, numerous guides in the region (walks, hikes, tours, skiing, diving, mountain biking, etc.), books, DVDs, comics, etc ...
Open kitchen fully equipped with table, 4 chairs, electric hob, microwave, fridge, dishwasher, toaster, Nespresso coffee machine with Aerocino, electric kettle, complete crockery ... Available: salt, pepper, sugar, oil, vinegar, paper towel, sponges, garbage bags, tea towels, toilet paper, cleaning products, water bottle, Nespresso capsules…
Bedroom with double bed (separate mattress), dressing room, window with electric shutter and mosquito net, bed linen provided (duvet with cover, pillows, pillowcases ...) changed every week, bed made on arrival.
Bathroom with tub / shower, sink, storage, hairdryer, towels provided (towels, bath sheets changed weekly).
Separate WC, cumulus 150L
WIRELESS
Large bay window overlooking the covered terrace with garden furniture (4-person bistro table with mosaic table, chairs and armchair).
Personalized welcome by the owners from 3 p.m. on the day of arrival, late arrival possible.
4 people maximum, pets are not allowed
Ideally located rental: Center of Théoule-sur-Mer with its amenities (restaurants, shops, sandy beach) at 1.5km, Cannes at 10km, Nice at 40km, Grasse capital of perfumes at 30km, Monaco 58km, St Tropez 64km, Gorges du Verdon at 92km, Isola 2000 and Auron ski resorts at 1h45mn.
Invoice for your Works Council provided on request
Panoramic Sea and Alps view, Large Swimming Pool, Quiet, 50m Hiking / Biking, Car Park:
For 3 nights minimum all year long (for the week from Saturday to Saturday in July / August): 2 rooms nicely decorated, with superb sea view and swimming pool which can accomodate up to 4 people in Théoule-sur-Mer (Alpes Maritimes - 06).
The apartment is located in a secure residence with guard, digital lock, very quiet enjoying an exceptional location at the entrance of the nature reserve Esterel (50m from the start of many hiking or mountain biking), with panoramic views on the sea, the bay of Cannes and the Alps.
Beautiful infinity pool of 450m-2 with jacuzzi and paddling pool for children, deckchairs and parasols provided, open from early May to October 2019, monitored in July and August.
The apartment is located on the third floor on 4. Living area 32m-2, the entrance gives access to the living room with open kitchen fully equipped.
Covered terrace 6m-2, a bedroom, a bathroom with separate WC, WIFI, private parking space, wide elevator.
Accommodation details:
Living room with a sofa bed for 2, flat screen TV, DVD player, Voltaire armchair, many guides and information (walks, hiking, tours, skiing, diving, mountain biking, etc.), books, DVDs, comics, etc. .
Fully equipped kitchen with table, 4 chairs, electric hob, microwave, fridge, dishwasher, toaster, Nespresso coffee machine with Aerocino, electric kettle, complete crockery ...
Available: salt, pepper, sugar, oil, vinegar, paper towels, sponges, garbage bags, tea towels, toilet paper, cleaning products, water bottle, Nespresso coffee capsules ...
Bedroom with double bed 160cm with separate mattresses, dressing room, window with electric shutter and mosquito net, bed linen provided (duvet with cover, pillows, pillowcases ...) changed weekly, bed made on arrival.
Bathroom with bath / shower, sink, storage, hair dryer, towels provided (towels, bath towels) changed weekly.
Separate toilet, cumulus 150L
Large bay window overlooking the terrace with garden furniture (bistro table 4 people with mosaic tray, chairs and armchair).
Personal welcome by the owners from 15:00 on the day of arrival, late arrival possible, checkout before 11:00 am.
Beautiful infinity pool of 450m-2 with jacuzzi and paddling pool for children, deckchairs and parasols provided, open from early May to October 2019, monitored in July and August.
Private covered parking space.
Garden furniture (4 persons bistro table with mosaic top, chairs and armchair)

2 room apartment new condition, sea view and pool is located in Theoule-sur-Mer. 2 room apartment new condition, sea view and pool provides accommodation, featuring TV, View, Balcony/Terrace, among other amenities. This Apartment features TV, View, Balcony/Terrace, to make your stay a comfortable one.

2 room apartment new condition, sea view and pool has 1 Bedroom , 1 Bathroom, and max occupancy of 4 people. The minimum rental for this property is 1 nights, but this can change depending on the season you plan on staying. Previous guests have given good rated it, and VRBO labeled it a top-rated Apartment because of the excellent services rendered by the owner or manager of this Apartment, and has consistently provided great experiences for their guests. Most families or guests that use it recommend it to their friends and some of them are repeat guests. Apartment has a friendly neighborhood, and the Theoule-sur-Mer has interesting places to visit. If you want to learn more about the Apartment in Theoule-sur-Mer, such as places to visit and things to do nearby, you can check below to learn more.

Show more
OneKey Logos

This Property is OneKey Eligible

Earn OneKeyCash for every dollar spent on eligible vacation rentals, villas, cottages, cabins, and more when you book on Vrbo.

JOIN TODAY

Amenities

Pool
TV
View
Wheelchair Accessible
Ocean View
Balcony/Terrace
Oceanfront
Bedding/Linens
Child Friendly
Internet
Kitchen

Policies

Check-in
Check-in time starts at 3:00 pm late check-in subject to availability minimum check-in age: 18
Check-out
Check-out before 11:00 am
Child Policy
Children are welcome.
Pet Policy
Pets not allowed

Extra-person charges may apply and vary depending on property policy government-issued photo identification and a credit card, debit card, or cash deposit may be required at check-in for incidental charges parties and events are allowed on site safety features at this property include a smoke detector special requests are subject to availability upon check-in and may incur additional charges; special requests cannot be guaranteed this property is managed through our partner, vrbo. you will receive an email from vrbo with a link to a vrbo account, where you can change or cancel your reservation

Check Apartment Availability
Nightly rates from:
USD US $106
You will be redirected to  
Hot Deal - It has been viewed 35 times today
Not the right fit? Check out our other properties in Theoule-sur-Mer
Property Image From US $131
         

|
8.0 (1 Review)
Other
  • Parking
  • Pool
  • TV
Property Image From US $91
         

|
6.0 (20 Reviews)
Apartment
  • Parking
  • Pool
  • View
Property Image From US $108
         

9.0 (36 Reviews)
Apartment
  • Air Conditioner
  • Parking
  • Pool
Property Image From US $213
         

Property Image From US $637
         

Property Image From US $333
         

10.0 (2 Reviews)
House
  • Air Conditioner
  • Parking
  • Pet Friendly
Property Image From US $313
         

10.0 (2 Reviews)
House
  • Air Conditioner
  • Parking
  • View
Property Image From US $138
         

10.0 (2 Reviews)
Apartment
  • Air Conditioner
  • Parking
  • Pet Friendly